Show CLOSE DOWN DOlN YORK WORK ON ELY SMELTER Steel Work Under Contract is About Only Activity Con Con- linued Cartoonist Whittle who ha has re returned returned returned re- re turned from frum EI Ely where he was employed em mn- for vera sc-vera sc months us as an en engineer engineer en- en In Iii connection with wih COI work of tho big smelter of or time the Steptoe Valley Mining Ji Smelling 11 company says tay a H that lint virtually all al work oik possible to be discontinued at the time plant was sas called off or on November Zo 1 1 Th Tho ThU steelwork steel work un under er contract to tu tho time American company compan Is being he heSH SH says for fOl or th time the reason on that Lime tho contract could coul not nol be e broken without a heavy y forfeit on tho the part of the smelter people pee peo pie an and amid work Is also on Oh 01 ono of the ten ton units unis of or the time concentrator concentrator con con- plant All Al other work has been closed down lown he lie says Sr'S and the men muon discharged nearly 2000 of them are arc rapidly leaving timo camp |