Show olson apartments going up the concrete foundation of the new ison apartments were finished tini shed tuesday and E K olson who is having the building erected has gone to salt alake lake to elect select the pressed brick and get the final specifications from the architect when he returns the contract for the brick work will be let and actual cansar can traction action work wiit will probably start ill in ten ton days the new building will be of pressed brick three stories high containing contal nine six alx lx apartments of live rooms bath and clobes closets clo aeta atsides vegetable cellars in tha the basement for each apart ment there will be a large for each floor in the front nd sleeping porches for each floor in an the rear I 1 he be building which will cost irately will be located j just auth of the court house it Is 1 being 10 0 arranged that as the demand for uch stich apartments iacre increases ses the build ing ng ran can be enlarged alink alon the same lines that it is being bein built steam heat beat will be added when an addition Is built but for the present the apart ments will be heated by stoves harold holmes Hol roes generally known km wn as mickey returned tuesday from a trip to salt lake there here he went to take in the big circus he ile is now back on the grick bricklaying laying gang ran |