Show To ro HuI Utah Aire II Tram The Tho locution location locton of the tire railway spur to connect with the Utah Apex AcX tram has been determined an and work on on both hoth will f start starl At rt once The material matt has hns hen been on the ground for some weeks only waiting for the placing of the terminal point of or the spur When completed the thc company expects to ship tons of ore daily daiY If I the pr present values hold out each cacti ton tori wll 1 bring a net of o A As A soon oon as aslie the lie main development dc work Is un under underway way ivay tire the output of or the project will wi be greatly Increased Bingham as d Bingham Press |