Show electric lights for three mile construction la under headway whereby tho the people at 0 abilo will havo have electric electr lo lights in tho the vory very noar near future they will also havo have tho the roe reg ular service from tho the telluride power company to run their motors and thus enable thoin them to bo be as aa modern as aa tho the rest of tho the world monday a crow of men with four teams departed for tho the hills to be gono gone four days when they will return with necessary poles polea with which to install the line and then tho the tion of tho the wires and other necessary equipment will follow and before the holidays in all probabilities that neighborhood will bo be lighted up in tine fine shape the poles and wires will extend quite a distance beyond throe three mile bridge this improvement has boon been brought about through tho the operation cooperation co of tho the enterprising people of three mile and tho the telluride power company and we are arc sure buro that after the installation the people that are arc being served will bo be happy and contented and tho the long winter evenings will seem boom moro cheerful and with tho the modern equipment that can be run with this dependable pen dable power from the telluride company they will be as aa contented as aa though they lived right in tho the heart of the city both parties connected with tho the project are to be heartily congratulated for this wonderful improvement |