Show preparing to aw go deeper with va av some drifting Is now being done on the 1800 level of the Opo hongo according accord ng to af manager ay birch of w the knight mines afisa plans have been made for the continuation ff si of work in toy as soon 17 as a small af hoist a can V be faw installed ay on the 1800 level 7 but E ff achile this machinery yv aff Is being pu place some attention Is being paid r to the development ff of the big zone of low grade ore which aw was caf en faw countered at that depth s several months y ago fy the ff from wv the 1800 now W has a depth of about W 60 feet W at and well be ff aff sent adiv down to the W or Vf 2000 fw level 1 |