Show three shifts at the chief cons three sh its are now be ng em loy ed at the ch ef cons in ne the single compartment shaft making it advis able to keep th ho sting engine in continuous on the manage ment does not intend to increase the output of ore but on the other hand is desirous of cro eding the develop ment work as much as possible the capacity of the ho at st operating with the three shifts is a trifle better than tons a day ani an wh I 1 it is not being run at its capacity post at present the extensive exten sivel al caja caiga agn of development wh ch has b v beely mapped out for th 9 property ln mike it necessary to hoist near nearly lylha ihal A amour t of material the drift on th 11 03 bev level el wh ch is being driven for the purpose of getting into the ore body previously developed bet veen th 1030 ani 1200 levels has already encountered values which make it almost a certainty th chatan atan ore deposit will be located at that dedah with its th rd sh ft tt at work the chief consolidated mine now has a force of men |