Show Re timbering carisa shaft the shaft at the carisa mine which was so badly damaged a couple of months ago when some of the old in the upper workings caved caned in has now been repaired to a depth of 00 feet below this point the shaft timbers were not damaged to any ex tent and a weeks will enable the timbe imen to reach the level with the exception of this shaft in wok 0 k the operations at the carisa are being carried on by lessees in the mchatton ground which is bing developed by lessees and which la is also reached through the carisa shaft a drift is folio follo ving what is known as the bed red rose fiss ii e in a southerly dime direction tion upon the level maurice anderson who is in charge of this well for the leasing company reports a very promising showing in the Me mchatton Hatton ground and believes that some good ore will soon be found upon the level where oper allons are now in pi ogress |