Show new machinery reaches the new machinery for the lion blossom 1 0 3 shaft aimed airi ed in this week and aud will be hauled to the mine within tl e next few days the cai cais s containing the machinery will be switched over to the high line at mammoth and a v agon haul of about one mile will be necessary to land it at the mine the new hoisting hoist mg plant bisone isone is one of the largest and besteder be best stever ever brought into this state it will be electrically driven and being of the very latest type the hoist w v ill bean be an economical user of po er at the mine there is now quite a large force at work A ork aung for the installation of the new plant ex cavata cavatino cava ting 9 has been under way for son sori e time and the gra grav v el and cement is be ing ang unloaded and within the next ten days the foundation aoge will be pretty well under wayfe will pei haps require a con ta of montt mont s to get the new hoist in running order the engine will be located but ashoot a ahoi t distance from the one which is now in nse use and a new shaft house will be needed to house it in in the under ground operations no time will be lost as a esula of the change aiom the old to the new hoisting equipment |