Show beck beek tunnel has shipment ready it A couple of carloads of ore will be sent out from the beck tunnel mine m within the next few days and this will n ake a total of six cars which have been shipped sn sit ce the compro comero it ise of the suit beaw between een this mine and the theli ut cle feam am supt bupt perry fuller ruller states that the ma macii it i drift which is being sent out toward the south will able have to be W arv driven D a distance of 50 or 60 fe feet t before reaching the point chure re orl ore should be encountered on beck tu inel ground j the ore is now bei bet ig followed from the which chich is dow down it a short dis tance below the tunnel level u |