Show material all hero here all of the material and machinery for or the rebuilding of the hoisting plant at the little chief mine is now upon the ground the carload of re built machinery having arrived on monday the work of erecting ane shaft house is well under way and but little time will be required to in stall the machinery which was sent to salt lake to be repaired because of the damage which was sustained on account of the fire that de strayed the buildings late in september of this year feurt joseph hannifin expects to have e en ery thing ready so that work can again be resumed underground dundei ground early earl next month |