Show NEW PLANT IS IN OPERATION over at the east tintic gintic development com company PCs any s property the new machin ery is now in operation and on wed manager kellogg started ft ork in the shaft he ile states that a station will be cutout cut out at the toot foot level and also at the level and that as soon as this work is completed the shaft will be dropped down adoth er feet with the new equipment the company will be able to put a force of miners at work upon the ore body which was recently opened up am al d depth of interfering in any way with the sink ing of the shaft this means that the company will commence taking out ore within the next two weel s prominent mining men who have been out into east tintie during the past few days say that the plant which manager kellogg has just in stalled at the east tintic gintic develop ment company is as complete as any in the district it is a model plant in every respect and the company is now in shape to economically handle the ore which has been opened up and at the same time carry on development work in the proper manner 1 the I he plant includes a 50 h p engine h p boiler drill compressor an electric lighting g plant with a capacity of 50 lights a t modern blacksmith and machine shop with lathe drill press and other modern equipment power saus sa s for framing timbers and in fact everything that is needed the plant was installed under the direction of F B sullivan formerly master me chadic at the gemini mine who will remain with the east tintic gintic dev co and look after the machinery now that it has been placed in running order |