Show gemini water for smelter the pipe line which connects the gemini mine with the tintic gintic smelter waa was completed on sunday and the following day the gemini water waa was flowing through this line to the smelt ing plant the big electric pumps at the gemini mine are now lifting about 19 gallons of water an hour and the largest portion of this water IQ i now running through the 6 inch pipe to the smelter of course the smelter is still getting some water from the swansea mine and conse is not by any means using the f full amount that is now flowing through lugh the pipe from the gemini later when the copper furnace is blown in which will be within a very short time more water will be used but with the two water lines the plant will never run short of water |