Show ore house ready 1 i manager A N Holo laway of the sioux cons mine was here during the week and says that a station is now being cut out on the foot level just as soon as this station c can an be finished a drift will be started toward the east for the purpose of cutting ithe the ore upon its dip the shaft will also be sunk fifty or one hundred feet farther the shaft work and the drift upon the 1 65 level can be handled at the same time and by the time the ore is opened up in the drift the new machinery will no doubt be ready for use uge the engine is now at the mine and an order haa has been placed with the provo foundry NI machine co for i new cage cars etc mr holdaway sa s that the ore house is now finish Q bd cd and that a switch is being put in to connect the sioux with the knight i he states that it will be a few weeks before the sioux is i ed to take its place among the regular shippers but when it does fall into line me the mine vill avill be good for from six to ten carloads a week |