Show at the zuma property the new compressor was put into position at the zuma the first of the week and the other equipment for the mine will probably be ready so that the hoist can be used within the next two weeks the building has been completed and a pipe line is be ing put in to convey water to the new plant considering the fact that the zuma was incorporated but a few months ago splendid time has been made in putting up a building and installing the machinery rasmus nelson is 14 superintending the development of the property while james knowles the master mechanic at the centennial eureka mire is giving his attention to the installing of the machinery |