Show tex tem TEMPLE TFX Lr SHOP three forges arcin are arc in successful operation at the blacksmith shop on oil temple block and two more are arc nearly ready one for heavy work a very large bellows we understand will be ready to act on monday prepared expressly for manufacturing mill cranks and bearings gea rings and such like heavy work with the most experienced hands to manage tile tiie whole which we expect will be able to satisfy tile the wants of the public till the tile trip hammer call can be completed |