OCR Text |
Show Work underway on Hobble Creek job many fish in the ,creek at this point but they stressed the fact that when work is done on popular fishing streams, all should work together on flood control without destroying the habitats for fish and wildlife. Vork began this week on dging out Hobble Creek funnel from U. S. Highway l to where Interstate 15 is ng built. Although most d dangers in the area are ieved over for this year, the :k will be carried out to ke the stream safer for fu- j seasons. 'horn Construction Co., sub- Ited the low bid of $12,686 Jo the job which is expected be completed in about three he Corps of Engineers will mce the project. It will in-le in-le besides dredging, push-back push-back the stream banks ire needed, removing ob-ictions ob-ictions and reinforcing the ks so that water will stay lin the channel in time of l water. he county commission is considering the possibility sending county crews into H I upper part of the creek to ' love any dead trees, stumps k other debris. lyembers of the county cora-iion, cora-iion, David Greenwood, ion Hinckley and Melvin ks made an inspection of . . creek last week conferring Mt Mayor Calvin Packard of ' Ivngville and representatives he Army Engineers, on the n ect. I Uso makng an inspection of proposed work was Don lCRr'ano' ce f fisheries and I Vincent, local conserva-. conserva-. officer. They were con-it con-it led about the effect on the II J! in the area. They noted ver that there are not CO |