Show Machinery to Build Dam is At Long Park Will Complete Project by October 20 Can Move 1000 Yards of Earth per Day The huge reservoir building bUdIng ma- ma machinery ma machinery chinel chinery which has been used on the Montez Creek reservoir in the western part of the county during the past summer was moved to the the- theLong th the Long Long Park reservoir north of ye- ye Vernal Ver Vernal nal oak Tuesday to complete that pro pro- proJect project project With the use of this big equip equipment ment meat capable of moving 1000 square yards of earth a day th project will be completed in twenty day days and be l lat ready for the storage of at water during the winter and spring A 90 80 horsepower tractor pulLs two carry aIls each holding twelve cubic yards This machine can move the 24 cubic yards every 20 minutes for 18 hours a day A 63 horsepower tractor or bulldozer Is also used to work the material for forthe forthe the larger equipment In moving the machinery from the Reservation It was necessary Ito to pass by-pass practically all bridges and the bulldozer was used to make land new roads through washes and creek beds Futon Jarman Is In charge ot of the of-the the machinery and is assisted by Richard Dye and Niles Nibs Hasle Haslem The machinery Is tri stake own own- owned ed ad and will be used as a non profit non profit venture for tor the Uintah Da- Da Basin Ba Basin sin water storage projects In their de de |