Show government approves ashley valley va 11 e irrigation project approval nt at the land office of the irritation irrigation project ol 01 the ashley Deve develosa lopa ent company ie Is contained in a notice received by leon P 1 t ersen ot at the local land office this approval mean means that desert entries can be made on land under the project using stock in abw lr ir oration system as water right the ashley development project alini alms to supply water to the bench lands east t of vernal about ten thousand acres of 0 land can be arri gated under Ms this project according to the company a estimate the res ervol will be located at the mouth ot at Stel draw where a dam of only tire hundred feet in length between the wall walls of 0 the draw iiii provide a reservoir ot of the above capacity W ter la Is to be diverted from the aabrey cre crek ok and the dry pork fork streams flood water from rom these two streams will collect in the reservoir during the high water among to be turned out upon the firms arm in a the ummer summer growing ia sea son on now that the land office hai has approved their project the company of c whom a 0 W dartch la Is an active member plan to puh push the project to completion according to reports part ot of the main easel from rom the th proposed reservoir has ha been dug survey jimm tor for the th whole project I 1 bave have already dmn made i i |