Show T irrigation PROJECT 1 the water to be flamed over tile the dry fork sink for fop irrigation in th s valley 11 benedict and J C J armstrong are in fit the dri dr volk canyon making ealo cartful ful mAl mates of the rost of carry ins ing the waters maters of the upper tipper diy daiy fork overt the binks arliese men inen represent a 1 colu company pany who onn on the bater ater tiling filing on o n tit tho sink water nater and they think they can sane sae the mater at a nominal cot coat and bring under cultivation all 1 11 allio the waste land in the south end of t h tj J e valloy valley mr armstrong to is an engineer aad and lie he wilt make accurate surveys of the necessary voik to be done and render a report and eftim tta itte ot of the cost cast to tile the company and ai V practical the work of reclamation swall will begin in ill earnest it Is not a scheme to cheit au all of tile the batem now in uso use by the farmers of this valley but rather to put a now new supply within the reach of tho the people so khe the waste places nn be irrigated it Is a plan to bring water and land together and mhd ashley valley farmers may have the opportunity to become in the project the promoters of the project have haie no de finate information to give out but if the plan is a good one they them will mill hae soon |