Show begin work on main street road commissioner thiessen Thie esen with a force of men began work on the state road running through the city on tue day the gradi grading tig will be ba finished from the north tide it if town to tho the race track before tho the fair meet and then contin ved down through town it is intended to make main street the street beautiful the roadway to bo be built by the state will be 48 feet wide this will leave a 10 or 12 feet wide outside 3 the sidewalks this will be curbed and parked for a distance of 5 blocks and will make one of the handsomest hanso streets imaginable on the street in ane business section the grade will bo full width the city will grade w a blood to the south and a block on ath from main to the court house bouse and tho the state will take care of ath running west as ae that is part of the state road the poles are all to be moved from the center of main street which will add materially to the looks of it |