Show DA DAM ThIM GREEN GREE At the instance of Senator W W. II 11 King ICing the federal power commission commission commis commis- sion has agreed to send one OIle of Us Its hydroelectric engineers into the Uintah Uintah Uin Uin- tah basin to make surveys and In Investigations investigations in- in to determine the feasibility and probable cost of building a dam In Green river for or the dual purpose of developing water power and impounding water for irrigation for use In Utah and Colorado Various Various Vari Van ous Otis private surveys Senator King says have shown that there are vast power powel possibilities along Green river but there has never been a federal survey looking to such improvement ment The power commission is not authorized authorized au au- au to build power projects but if it its engineers find that a joint power powei and Irrigation project in iii Green river is feasible and the cost not prohibitive Senator King believes be be- neves hieves such a report would place the Green river project within the scope of projects that could be e built under pending reclamation legislation if that legislation should be enacted If the reclamation bill should fail Senator King then will urge the building of a Green river dam clam and project out of moneys in the tho reclamation reclamation reclamation mation fund |