Show High Water Vater Stops Work Vork on Duchesne Bridge ridge High water has Ja forced suspension suspension sus sus- pension on of work on the Duchesne Duchesne Du Du- I chesne government o bridge The abutments are all nil complete complete com com- and A. A J. J Ramsey foreman foreman foreman fore fore- man for the the Omaha Steel Structural company was ready to put in the false work but found that the current in the theer ther r river er is too swift for safety j Mr r. r Ramsey was was in Myton lyton Thursday and telegraphed to his com company pan for instructions The contract calls for the completion completion completion com com- of the bridge e not later than J June une 17 which will now be impossible The rhe company i is liable for a forfeit of MS lS high as 25 per day for every day the thc work is is unfinished after that d date t Efforts will be made to have the forfeit remitted Mr lIr Ramsey Hamsey hopes to to ha have hae e the bridge in shape sh pe for foot passengers passengers pass pass- engers at l least for the Foul th ot of July This structure will be something something some some- thin thing similar to the thc Myton 1 bridge e in appearance with the I. I exception that it will be bc forty feet shorter and will have hae a wooden floor The Thc appropriation I tion was The The cost will wilt willbe be bee approximately J 1 |