Show Mattson Is s For or I Colton Duchesne ton ton- The state highway commission commission commis commis- sion sinn held a meeting sheeting last Saturday Saturday Saturday Satur Satur- day afternoon when Commissioner Commissioner Commis Commis- simler David Mattson reported on tt the feasibility of the proposed propos propos- ed Utah Uta It Colorado high highway way That portion of his report which pertains to this s section is as follows fellows f tt i i 1 also recommend that a state road be designated i h begin beginning ginning gin gin- ning nine at the town of or Gate Castle in Carbon l county and running thence in a northeasterly direction direction direction tion through Willow creek canyon canyon can lau yon to th the st state te road as now designated between Theodore Theodor in Wasatch h count county to Colton in Utah county and that the state road heretofore designated and aud described as follows follows- Beginning Beginning Beginning Begin Begin- ning at the town of Castle Gate and anI running thence in a a northeasterly northeasterly northeasterly north north- north north- easterly direction in ill Price canyon canyon can- can yon von through Nolan and and ancI be he abandoned for the reason that it would be he necessary to encroach upon the right of way of the Denver Derl and and Rio Grande railroad and to build at nt least five fhe bridges and build a n dugway dugway dugway dug- dug way the entire length of the canyon in solid rock and for further reason that in building building building build build- ing a railroad through Price canyon canyon the state would he compelled compelled compelled com com- to cross and the theD D Denver n ver and I Rio io Grande ra railroad many times while the road load from Castle Gate through Willow Willow Wil ViI low tow creek canyon to the slate state road as now designated between between between be be- tween rh Theodore odore and Colton could be built for a very small suin sura in comparison son with the road in iii Price river canyon I 1 also recommend that the state road commission use their efforts in securing a prison c camp mp in Willow creek canyon for constructing said road as most of it is moving rock and building dug ways where it will require principally hand labor If this road should be built it would connect Carbon Emery Grand and San Sati Juan Juau counties with Utah county and the rest of the state slate which I think is a very desirable thing to do Q Sa |