Show DITCH CLEANING IS COMPLETED COl AS GARDENING STARTS Cleaning of the Irrigation system system system tem in Duchesne was completed this we week k it was announced by byWater byWater byWater Water Master Mas r Harry Bryner Attention Attention Attention At At- was directed to the main canals and laterals this year which were given a complete cleaning and enlarging to enable them to carry sufficient water for forthe forthe forthe the garden plots already started throughout the townsite Chief attention was directed to the construction of a new channel from the new at the Duchesne Du Du- Du- Du chesne rh river r to the old This was cut in practically a straight line through the old river channel and is large enough to deliver all the water necessary to take care of the extensive gardening gardening gardening garden garden- ing carried on within the city limits All of the main laterals ha have ve been enlarged considerably m mainly mainly main main- in- in ly with willi teams and scrapers the first time this kind of work worl has been done for several years Little work was done on the smaller ditches under the theory that with sufficient supply of water these ditches would need little atten atten- tion A total crew of 22 men was employed employed employed em em- for the work over a period of a week to complete the work 17 of the men worked single handed while five were employed with teams The irrigation system is now in better shape to take care of gardening needs than it has been for several years Mr Bryner feels |