Show inspection group reveals hazards in tooele thoele district schools held under the direction of sherman T hun at a fire inspection within ter chairman of fire prevention utah safety council schools reported to be tolerable but with cornec the tooele thoele district were tive measures taken soon as recommended by the party they will fire become satisfactory faulty wiring overcrowding infrequent drills and boiler rooms improperly cut off were among most criticized by the inspecting group superintendent sterling harris announced that recommendations will be complied with as soon as possible the investigation was conducted at the sugg of mr hunter and those thos e in the party included jaycee president ent A 3 gunderson superintendent t eident harris frederick G kluss utah fire rating bureau vaughn L hall director of health max S banks field representative utah safety council L william keyser chairman fire prevention intermountain fire underwriters and T theo tate assistant fire chief of tooele thoele mr harris revealed to the group that increased enrollment of the tooele thoele central school was one rea son for the overcrowded conditions as students are now going to a school originally built to accommodate district enrollment has grown from 2451 in 1944 to 2931 today with only one school that at ophir declining in enrollment many improvements have al ready been planned and only the lack of funds is holding up construction st work on some buildings A new brick school Is planned for tooele thoele city soon this building to be built of modern fire resisting materials with boiler room in a separate structure located away from the main building schools inspected were those at tooele thoele TOD park stockton and 0 ophir |