OCR Text |
Show Public Notice Culvert Extensions In Grand County, the same being that section of Interstate Highway No. 70 From Floy Wash to Crooked Wash Identified as Federal Aid Project No. 1-70-4(15)176. The length of road to be constructed or Improved Is 4.895 miles, and the principal princi-pal Items of work are approximately ap-proximately as follows: 636,-000 636,-000 Cu. Yds. of Select Boi-row, Boi-row, 67,400 Tons of Bituminous Bitumi-nous Surface Course 34" Maximum and Portland Cement Ce-ment Concrete Class "A A" (AE) (Estimated Quantity -1624 Cu. Yds.) at Per Lump Sum. The project Is to be completed In 175 working days. Prequallflcatlon of bidders Is required. Prior to anybld-der's anybld-der's receiving plans and specifications, spe-cifications, It will be necessary neces-sary that the bidder have on file with the State Road Commission Com-mission of Utah completed and approved, the required Pre-quallflcatlon Statement pertaining to contractor's e-perlence e-perlence and financial condition. con-dition. The attention of bidders Is directed to the Special Provisions Pro-visions covering subletting or assigning the contract. In conformity with the Federal-aid Highway Actof 1968 the U.S. Department of Labor has certified the wage rates for the project which are the minimum wages to be paid 1 on this project. These rates are made a part of the con- tract documents. The attention of bidders is directed to the fact that this Commission has been advised by the Wage and Hour Division, Divi-sion, U.S. Department of Labor, La-bor, that contractors engaged in highway construction work are required to meet the provisions pro-visions of the Fair Labor Standards Act of 1938, (52 Stat. 1060). The State Highway Department, Depart-ment, In accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252) and the Regulations of the Department of Commerce Com-merce (15 C.FJ?., Part 8), Issued pursuant to such Act, hereby notifies all bidders that It will affirmatively ln- snr thnf fhft rnntrnpf onfpru. ed Into pursuant to this advertisement ad-vertisement will be awarded to the lowest responsible bidder bid-der without dlsclmlnatlon on . -the ground of race, color, or national origin. The State Highway Department also no- ' titles all bidders that It will affirmatively ensure that In any contract entered Into pursuant pur-suant to this advertisement, minority business enterprises enterpris-es will be afforded full opportunity op-portunity to submit bids In response to this Invitation and will not be discriminated against on the grounds of race, color, or national origin In consideration for an award. Proposal forms, plans, and specifications are on file In . the office of the State Road Commission, Salt Lake City, and the office of Its District Engineer at Price, Utah where they may be reviewed by prospective pros-pective bidders. Specifications, Specifica-tions, proposal forms, and plans may be obtained only at the Commission Offices at Salt Lake City, upon appllca-" tlon and payment of a fee ol! $20.00, no part of which will be refunded. i Each bidder must submit a bid bond from an approved surety companyonformsprc vlded by the Commission; or In lieu thereof, cash, certified certi-fied check, or cashier's check for not less than 5 of the total amount of the bid, made payable to the State Road Commission, as evidence of good faith and a guarantee that if awarded the contract, the bidder will execute the contract and furnish the contract con-tract bonds as required. The right to reject any or all bids is reserved. Any additional Information may be secured at the office of the State Road Commission. Commis-sion. Dated this 19th day of April, 1975. State Road Commission Of Utah Blaine J. Kay Director of Highways Published In The Times-Independent Times-Independent April 24, 1975. |