Show WORK ON NEW WATER SYSTEM STARTS MONDAY Carload Shipment of Pipe Arrives Ar- Ar Arrives rives With More En Route Construction of Moab s new water water- waterworks 1 works and sewer system will ill commence next net MOnday morning December 17 according to Contractor V R Bush A carload shipment of four inch flow line pipe reached Thompson Thompsons Monday and is being hauled to Moab Adds Add shipments of pipe wIll arrive as needed during the course of construction Work will start at the spring on the Westwood ranch four miles east of town end and the flow v line pIpe will be laid as the trenching ng progresses towards town Length of flow line from spring to the storage reservoir is about two miles Work will be prosecuted just as fast as weather eather conditions permit Mr Bush states Weather at present while somewhat cool is et e that could be desired for rapid construction Contractor Bushs Bush's brothel W C Bush plumbing contractor ot of Grand Junction will arrive in Moab today and will be connected with the installation hon tion of the system |