Show I 1 BAD WEATHER HALTS OIL development WORK bad weather conditions during the week have halted oil development throughout the southeastern utah urea the shafer no 1 A well down the river from moab is still closed down due to the fact that the river continues to be jammed with ice preventing the transporting by boat of fuel and supplies to the camp the utah other well king no 1 in salt valley will be deepened shortly but operations cannot be resumed until the roads are passable the petroleum well south of green river is still fishing tor the sandburg petroleum well north of floy Is getting its water line in operation and work will start very soon ahe navajo petroleum well on cisco dome has not been able to resume work as yet due to severe weather on crescent dome the crescent syndicate is getting ready tp deepen the mccarthy no 1 well but the moving of a new rig from cisco has been delayed by impassable roads |