Show NEW LIGHT PLANT UNIT INSTALLED the utah power light company has completed the installation of a gasoline engine unit at the local pow er house which will be used during emergencies when the water powe plant Is thrown out of commission by floods and ice conditions the new unit was placed in operation tuesday evening and carries the load on the local system satisfactorily the water wheel and old generator are now being and this work will probably require a months time the auxiliary unit Is now ing used during the overhauling of the water power system the installation of the new equipment has been done under the dire alon of george pickering construe alon foreman of the phoenix utility company a subsidiary of the uti power light mr pickering will remain here while the additional am prove ments are being made G R oisen of the engineering department part ment of the utah power light and E P helm superintendent of the eastern utah division of the company were in moab yesterday to inspect the new unit |