Show IAlA ALTA CON COM PREPARING I FR FOR BIG Tills THIS SUM SUMMER With a R high grade allver oro ore shoot 40 feet teet long on n th the tho strike of or orthe the tho vein pin and proved pro by raises on Its Us dip to 10 a height of or feet teet tho the Alta Alo Consolidated now looms on tho horizon horizon hori hon zon son a an as one ono of or the big biff producers of or the Alta Cottonwoods Alt district According to Mine Une Manager Jacobson Jacob Jacob- son rOI and aud Let Lee tho mining en engineer en- en Incer drifts sent ent out In two directions directions Hons from the highest point in the tho thoraise feet teet long long- all aU allin allin raise are now non lf- lf o in good shipping hipping ore ort the time vein on this level being from three to five feet teet long From this point to the surface It is feet ctt Possible ore In this shoot If l It I continues to o the surface may th therefore he estimated n nn as fol fol- lows Height feet length 40 feet teet width average 2 z feet foet average gross value 40 0 and net value 30 rS Shipments will wJ bo be bC resumed at nt the Alta AHa Consolidated ns as son soon ns as IS th the roads which are now practically free r front from snow chow cr dry Iry UI up to permit permit permit per per- mit the use of or hea heavy ore wagons The road Is now open to the thc Wasatch a Mines company's compressor plant at nt the portal of or the Columbus tunnel which IR is situated about a mile mUo below the tue tie Alta Ala Consolidated The bins contain nearly tour four ton fifty ton ff-ton carloads of or ore O running about 40 40 a a. ton and Mine Mimic Manager Jacobson expects to be he beable beable heablE able ablE to maintain a n weekly output of ot three cars of or this grade of or ore during the summer ummer It I Is Ig understood that tho the Utah Michigan Mining company compan which owns th tho aerial tramway connecting connecting con con- cn- cn i the Utah Michigan as well wel as the Alta Ala Consolidated t with Tanners Tanner's Tan Tan- anner II ner's ners Flat Flat four tour miles mUes down own tho the canyon canyon can can- cn- cn yon on will wi at once begin the reconstruction recon recon- of ot th the head hou house e which WAS burned last fall al and as us soon as IS title work worl i is completed the tramway will wi be put In commission greatly facilitating the shipping of ot ore from Ilie he Alta Ala Consolidated at a bi big his sIng saving sayIng say sav s i ing ov over r tho the cost of ot transportation b by wagon |