Show Jno PROM 1 II tu lh 1111 COl 11 WI Will Sink Thos Sappington superintendent ot of tIm tho came out from Bilt Salt Lake yesterday to 10 arrange for the tho Ion or of work It at the mine Some time ago ton a 11 contract was let for tor sinking the shaft another 10 feet but the contractor tore tor were unlucky wih with the tho m machinery and stopped work The company wi will however hower push the on down to the tho 1 level It at once E P D Swan and J W V Campbell 1 managing dIrector or of time the Gunyon MinIng were out rem Salt Lake Lako this week meal and let a contract to Win m Jotter tu to sink the shaft another feet from which n a wi be run to the ledge ledge Tit The Gunyon property which consists of a a group ot of three claims Is located at al Diamond and lies between time the Bucke Buckeye anti Fisher The shaf shaft Is now down fet feet and Is timbered In excellent shape shalle all the way down A lies ben been run from tb tbs hot bot bottom torn tom of the shaft t tIme ledge 1 a dIe tanco of at thirty feet The crosscut ox ex tends Into the ledge eleven tot f t but the hanging wan valt lisa not at been and the size or of the mineralized belt ha has not yet ot been ascertained The Theor Theore hel or ore 1 15 a lend Iad carbonate to and samples m III ha have been beAn sent to 8 Se Lake Ike to be tet test Record |