OCR Text |
Show THE CACTUS IMPROVEMENTS. The management of the Cactus group of mines Is considering bids for the construction of a power and electrical plant at that property, out of Frisco. The specifications require a steam plant by which electric motors will be supplied sup-plied with power necessary to operate cars between the concentrator and the loading station 6000 fet deep in the tunnel. tun-nel. 1 is understood that a big mill and smelter will follow the installation of the power plant at the Cactus. |