Show Gymnasium Bid Bid Asked by Price e PRICE PRICE Advertisement Advertisement of or a call for new bids for the construction of a gymnasium in conjunction tion with the municipal building now flow under construction were an- an ed by Mayor J. J Bracken Lee Original bids on the building all all' allor of or which were rejected ted when the cost was found to be excessive were opened October 3 with the low bid listed at The new plans with dispense some of the equipment features but in inno no way cheapen the construction of of the building proper Mayor Lee said The new bids will be opened November November November No No- vember 4 at 2 p. p m. m at the city hall according to the announcement |