Show SOUTH STATE STREET PAVING JOB AWARDED Contract for center strip of South State street from Seventeenth Seventeenth Seventeenth Seven Seven- South to Murray was awarded by the state road commission Saturday Saturday Satur Satur- day to Gibbons Gibbo lS Reed of Salt L Lake whose bid of was lowest of seven submitted for the project The paving will cover the space recently occupied by street car tracks for tor a width of 20 feet 9 inches transforming transforming trans trans- forming South State Slate street into a fast highway 60 feet wide A six six strip of ot white cement will be laid itt ift i ithe the pavement to mark the dividing line Une between northbound and southbound southbound southbound south south- bound traffic The work will begin in the spring S The commission awarded the contract contract con con- tract for graveling 9 45 miles of highway highway highway high high- way between Levan and Gunnison to Smith of Price who submitted submitted submit submit- ted a low bid hid of |