Show STEPTOE VALLEY HUH IS GETTING READY RADY FOR OR ORS ORES FROM FROMM GIROUX At M the Steptoe valley nUey smelting plant a at al everythIng ver these da days das 8 IB Is being rushed along In ln making preparations tor fo for th the th handling ng of ot the Increased d tonnage which will Mill be brought about out b by the tile treat merit of ot the tho Giroux ores after the Is 1st of oC oTa Ma May according to Ely Ety Expositor The Tho mechanical and engineering depart monte monta aro are rapId rapidly I bringing to a R. clot close tile the plans and estimates of nt if th the n necessary changes In the th respective e dc do- de- de to mona economically economically- and alId ef of- Helen ly treat tho tile Increased d tonnage To Jo p do lIo this requires modification of or tho the treat treat- ment system now in ln vogue the of a now new water 11 pips 1 L linc mi r pumping lumping equipment larger large settling vats and numerous machinery re re- re paIrs Voik Olk uPOn these Is Isi now no being ru rushed and ere the the c time for tot the th contract i m.- m. o delivery of ot the tho ores orM has arrived everything e at al the th big hll con concentrating ant aull smelting g plant w will It bo he In most mst excellent nt condItion to reecho receive and treat the tho same without deJa delay treat Modification In climatic con conditions fo for for weeks past has ha enabled work ork at th the tue plant plan to be te accomplished he more rapidly and Ind with Ith more degree of efficiency than It wua Willi po possible to do during the tile extreme cold weather of or December and January has haJ also been an Important factor In Ill en Nt- abling more extensive operations at at UI the tho I Copper Mat Flat mines and the extraction o at 01 an Increased tonnage from steam stam shovel shove I work which was Voas considerably impeded heretofore b by tho the freezing of or the overburden over over- burden an and ore not only anI in the embank embank- merit but In the a cars after their thell doIl er cry ery at th the smelter which necessitated d their being blasted to unload their con con- tents At both mines mill and smelter not withstanding changes at at the tIle latter now In process a n. large tonnage Is being pro pro- and treated from their own prop prop- prop prop- |