Show Three Sewer Projects by Commission Three projects concerning sewers and drains were authorized Wednesday by the city commission on recommendation of City EngIneer Engineer Engineer Engi EngI- neer Harry C. C Jessen At a cost of ot 1800 construction of ofa ofa ofa a sewer in the vicinity of North Salt L Lake ke stockyards was approved Cleaning the main east side draInage drainage drainage drain draIn- age canal between Mellan bridge sewer outlet was a and d the gravity approved at a cost of The sum of was made available for excavating the outlet of ot the main drainage canal into Great Salt lake and of the canal west I bank through the lowlands |