Show Repairing Break In Colorado River Washington Director Walcott of the geological survey has reported to the president that the Southern Pacific Paci-fic road Is at work with a large force of hands repairing the disastrous break In the Colorado river according to tho request of President Roosevelt Piles are being driven along the banks of the river at the point of the break and railroad tracks mn over these With hundreds of cars the railroad company Is dropping hugo rocks Into the break and the sands of tho river are slowly filling over these brush Is added and it Is hoped to fill the break in record breaking time |