OCR Text |
Show given to J. C. Magutre of But:-3.6 But:-3.6 miles, eighteen feet wide,; tt $98,000. This eectlon of the mi macadamized eight years out. The remainder of u.e . i; between the points named i '! eled this fall and winter a; -relief. To expedite the work: loaned the county six array !' The commissioners have ar eral aid In rebuilding the h miles of the same highway material and width. WORK ON HIGHWAY IS SOON TO BEGIN BLACKFOOT, Idaho, Sept, 6. Reconstruction Recon-struction of the state (Yellowstone) highway high-way in Bingham county, between Fort Hail and Blackfoot. Is to begin September Septem-ber 15, and to progress so that the bitu-lithic bitu-lithic surface work shall bein not later than October 15, according to a contract |