OCR Text |
Show CARDIFF READY TO INCREASE OUTPUT Four Motor Trucks Are Here, Two More Shipped; Kepairing EoadB. Marked activity in the stock of the Cardiff mine, the properties of which are in Rig Cottonwood canyon, aa manifested manifest-ed on the Salt Lake exrhange yesterday morning, naturally brought many inquiries in-quiries an to whether late developments At the mine had not proved unusually significant. sig-nificant. At the local offices of the company it wna stated that the Cardiff was nearing completion of its preparation for a cam-palKn cam-palKn of Mpf production tills season. It u ae announced that four of the trucks to be. used in the hauling of the ore had already arrived and that the other two had been shipped. A small tonnage of ore is being: sent down from the mit at the present time, but tonnspre has to some extent been 11m-Uod 11m-Uod owinar to a bad washout in the can- i yon, which, however, is now nearly repaired. re-paired. The statement was made that within two weeks the tonnage would probably be up to 100 tons per day. |