OCR Text |
Show EW BRIDGE TO REPLACE POWER ROAMRIBBING Vater soaked by melted snow i heavy rains, the cribbing porting the Utah Power and ght substation road above the ngham Central school collapsed eut noon Sunday, i new concrete and steel bridge, feet long, will be built by the ,ver company to replace the bbing. The structure will cost proximately $2500 and this a-unt a-unt was included in the wreck-i wreck-i clearance and road replace-nt replace-nt expenses, estimated at $6,-by $6,-by George Bihler, Utah Pow-and Pow-and Light Bingham division nager. 'he cribbing collapse and road le was not sudden. Power com-iy com-iy employes had ample time drive two company trucks I two cars kept in a garage at substation over the road and a Bingham garage before it ame impassable. Thirty min-i min-i elapsed from the time the e began until it had settled. School children would have n in no danger even had the e occurred on a school day children been playing on cribbing. They would have time to move from the path he slide," Mr. Bihler said, water line broken by col-e col-e of the cribbing was repair-in repair-in twenty-four hours. J |