OCR Text |
Show Contracts Signed. Special to Tho T.-lbunc. OGDKN. May 10. Contracln were. Bicneil thin otcdIur betT.'een the Opden Canyon rtcservolr compHiiy and the engineering firm of lloitaph & Roachc for the preparation of working plana for the construction of the South Fork dam In Oft-den Oft-den canyon. The plan are to bo completed within thirty dayn. The completed dam will cost approxlmaloly !00.000. Tho fpccIflcallonH In tho contractu signed tonight call for a rock-nil dam with reinforced Btcel cors: length at bottom. 30 feet: length at top, 730 feci. Tldth at bottom, 210 feet; width it top, 30 feet. |