Show HEAVY RAIL ARRIVING I 5 Then Placed on Main Lino the 65 Pound Rail Goes to Central The heavy Topound Mteel l rail for the S Rio Grando Western Is arriving and will soon be dhtilbuted along the lIneS line-S between here and Ogden The present main line Gopound rail when released will be distributed along the Utah Central S Cen-tral to bo In readiness for the broad gauging of that line The rail at present 5 pres-ent In use for the murogauge asS as-S well us the third rail between here and Shale will when released be sent to some other point probably Belknap to S be laid on that extension The Marys S vale grade is practically completed butS no tracklaylng will bo don until the S rail Is released The latter work can S be done In a week however as the extension ex-tension Is only about eight miles |