Show THE KNIGHT MINES reporter eureka utah charlie earl who is assistant superintendent of the knight mines in the tintic gintic district states that the shaft at the crown point property is now down to a depth of feet and that as soon as the level is reached a station will be cut and drifting started over at the iron blossom sinking is also in progress and tile the shaft has now reached a depth of feet it is the intention of the company to commence drifting as soon as the foot level is 19 reached mr earls says that the new shaft at the beek beck tunnel is now down feet and still going deeper A station was cut at the level but no other work was done at this point splendid time is being made with the work in the shaft and the new workings will soon be down into the ore work is also going along in a very satisfactory is factory manner at the colorado the new shaft has penetrated to a depth of feet and it is quite likely that crosscutting cross cutting will start at the level all of the knight mines are reported to be in splendid condition the only trouble being that there is no market for the large amount of ore which the colorado and beck tunnel could produce at this time |