Show 0 THE LLANOS DE ORO MINE oasis nogales ariz the llanos re oro mine in sonora is now in condition to reimburse re its owners for the expense occasioned in its development and later pay dividends on the amount invested the fourteen mile pipe line from trincheras Trin cheras to supply the workings wa with th water has been completed and water has been turned on this week the hundred stamp mill for the crushing of the ore a cemented gravel is well under way fifty stamps being now in position to operate so the treatment of ore will commence at once it if it has not already commenced before this issue of the oasis reaches its readers the mill has a daily capacity of tons it is all steel structure and cost the company the construction of the pipe line and other work per to operating the great placer property cost a like amount making in all half a million dollars expended in the work of preparing to profitably treat the output of the workings the mill is about a mile from the present workings and is connected with the diggins by a tramway on which are run electric motor cars in trains of twelve cars each about sixty trains a day can be run from the workings to the mine between two hundred and three hundred men are employed and the number may be added to as the placers are more widely developed captain C E perkins of nogales constructing engineer for the llanos de oro company who had been in nogales for about ten days returned to the mine tuesday night |