Show aaa developments a IV AT THE alu EMMA biama MINE i 4 ARE REACHING NV AN Xa EXCITING POINT 1 I 1 since telling so of the dill bright prospects which involved operations jr at the dill j emma allu ula silver mines property al at alta four weeks ago things have daull been happening about the dill first so of the present month the dill first carload Pu so of ore aio IS from luo the dill drift along the dill snow fault plane AX which ell had p only just been entered when the mining reviews aad previous snOlA article was sum printed p was marketed that aull shipment 4 so of ore netted the aill emma UH 11 EU company after all charges were paid at ac a ton LIOI the dill second o carload 0 PL is S on the market pill and will likely be settled pomos for by the time this S issue bonss sl is CLU mailed oll p it 41 ST is a larger juo car PUL and si is expected to 01 bring more per ton than pip did III the 0 TUT initial P fel shipment alaj while 31 a third car shipment ST is now being 1 mined and hauled eq pin to 01 the dill sampler dulus and will be on the atil market abul in a few days s IV at the dill same time the all crosscut drift which was SIM started in 11 the dill tom wo moore gunj tunnel la at a point about 1400 feet from the portal with the dill object so of cutting the dill faulted segment of 10 the dill emma opol lode at or 10 OLT near av its junction with the gill snow fault has been was sent out ino a distance so of about feet and tu if the dill calculations so of geologist 1 beeson plue and the dill management ELU DIP are not IOU r at fault more dim than two thirds SO of the distance to ol the objective has been covered so OS that L 4 a few a ak at weeks D S will tell the dill tale farther eq back ap ul in this crosscut a raise si is being made that lill I 1 is sa s1 now approximately ninety feet above the dill drift taking the dill dip so of the dill beddings through which the dill ip drift aj suna runs u and which have nauji been penetrated ul in the all mosiej raise SE as well everything colwill indicates sal that the dili latter will HIM tap dul the dill foot wall side op so of aj the a j faulted u n poll segment SO of the dill emma opol lode or 10 vein possibly within the dill next ten 1131 aj feet 4 more or 10 less the gill lime strata which the 9 raise m was su cutting just a few days ago ST is mineralized with disseminated particles SO of silver pill and the dill management sl is sanguine na am that I 1 the dill main dl ledge ap 3 is ST close IE at hand S some amo aliza tion sl is OSIE also showing ul in the dill face so of the dill crosscut drift in u the dill displaced segment SO of 4 the oli plo old emma vein to 01 tap dul which the dill work described si is being done there boqi o will be at 41 least jaaj feet so of backs S the gill segment below the fault plane that was SEA mined p q by X the dill 2110 original PuT j emma company contained about feet so of backs or jo dols 2111 e area pule and produced somewhere around JI if III the lost segment proves SE as good the present company si is destined to 04 mine or 10 olt Is from llo it 41 before oa it 11 is ST exhausted ill that E 4 is sl the dill way things look 1001 today JI if the dill lost ISO segment so of the dill vein sl is found su as expected the dili ej fact ao that it si is tapped at it the all bottom and e pu feet above on SIT its dip at 41 the 4 it 0 same ames time means that production can ue e u begin on U an U 0 extensive X 31 ISU scale without delay |