Show NEVADA 11 1 1 C carlisle manager of the tonopah mining company P any reports the mine is in excellent condition with favorable outlook for the future concerning the a ver very y report recently published that the company was retiring from all air other fields to concentrate its efforts in tonopah To mr carlisle said that on the contrary its representatives were at present examining properties in canada mexico and in other sections the belief became prevalent because the company withdrew almost simultaneously from cripple creek and hamilton where it had been carrying on mining operations tonopah mining reporter the 10 stamp amalgamating mill at the spearhead mine says a virginia city news item is nearing comple a tion and most of the machinery has been set except the rock i 3 crusher electric wiring was finished recently the mill is ri 0 on the hillside below the mine and the ore will pass from fromet ie the ore bin to the mill by gravity r the king group of gypsum claims eight in num number bert s and comprising a full quarter section of partially developed i ground four miles east of lovelock generally referred to in in as the william daily gypsum holdings are reported op r tinned to E M hamlin of san francisco and it is said a it substantial payment was made as an earnest chas owner of the lyndon mine in the comet district has received returns from a car load of silver laadt lead ore shipped from his property to the american smelting smelling Sm elting and y refining company at murray utah the shipment con aisted of approximately thirty tons from the lyndon mine andl and an additional ten tons taken out by b y john crowe from adjoining prop property erty pioche record jib A hoist is being installed at the dan tucker group of properties east cast of fallon and a building to house a power p ower 0 unit is being erected the hoist w will be over the dan tucker i alia shaft it no 2 which has now reached a depth of ninety feet it is is expected the shaft will be sunk thirty feet more to inter sect with the no 1 ledge where it is hoped a good body 0 of ore will be encountered encounter e d good values have continued down dow the shaft H diamond drilling operations have commenced on the east side of lime hill on the property of the raymond ely i 1 extension company at pioche the machinery arrived arrive re tiia bently and was installed and put in operation by the miller of brothers who have had much experience in the operation 0 the drills and at this writing are making good headdy 9 with the work the equipment which has been installed 1 one of the sullivan machinery companas Comp anys machines capa ble of reaching from 1500 to 2000 feet in depth f H P kervin and M J kibby prominent ent nevada liberty S on ing I 1 nien men have recently completed a survey of the contract LID mines mine at lime mountain it is understood that a cowl ivoa has been let for a considerable amount of development st he there this winter upon the recommendation of a pron linen FD H it b west state engineering firm of which form former er governor go vertio r 1 pill boyle is a member mr kervin is most antl enthusiastic 01 e the possibilities of this elko county property interested and i i that he is certain that eastern capital can call be interest ess the property the foot level of the thene main drift on the t rand mine which is being driven from the shaft feet 11 ce ll al the main vein system has advanced a distance ot of train forty 10 j ein 0 01 o W V general manager says that the w shaft an will be intersected at about seventy feet from the s J that the chances should be good for high grade ill min of of e Cs i so tion at that depth another forty ton carload 01 th ly a Pled ka from the feet level is now being sain CO rn in pa an hazen haen plant of the western ore purchasing purchase Pur chasi 9 chiefly jy 0 ilk PI production from the main vein near this point A awill vall the foot level has been approximately feet from the foot level is now down twenty t h fee atu 1 tit good ore nevada mining press |