Show NEW MILL AT PIOCHE READY TO GO the mill of the union mines company at pioche is now being tuned up for commencement of milling operations and unless unforeseen difficulties arise arise ore should be passing through the crusher next weel says the pioche record the ore supply will on the start be derived exclusively clu from the companas comp anys mendha mandha mine ore for three years continuous operations at the rated capacity of 60 tons daily being blocked out in the mine besides which a large tonnage of ore is contained in the big dumps surrounding the main working shaft the heads are expected to assay in gold ounces in silver and 85 per cent in lead this ore will be treated by concentration and flotation two modified callow cells and four wilfley tables having been installed squires and gemmill mining engineers of los angeles are in charge of operations |