Show DEEP WORK AT TINTIC STANDARD the usual amount of development work is in progress at the tintic gintic standard mine in the ie east tintic gintic section says the eureka renter three drifts are being driven from the ae th shaft of the company and it is un der stood that one of these drifts is heading out toward the south with a view to develop lag g the south uth end of the standards large meral al tract with this work is being watched have hav e considerable interest as it will likely an important dormant Dor tant ilea bearing on ground which to the south of the standard r the are ale ore reserves in the tintic gintic standard behrig iller better bette increased eased and the mine is looking cording corah thala n at any ume time ln in its history ace to biti miners millers who have been through er ground zot not being b workings shipments are addor wile owned crowded because this is not a an its time to cut and slash the depos the eral contrary the management is exe are re in the selection of ore which can be marketed to the best advantage during these trying times for the mining industry the deepest level reached from the main working shaft which is the 1450 now shows a large amount of good ore although no eff effort ort is being made to draw a part of the mines tonnage from that level drifts are being sent out into the ore however for the purpose of getting a line on the size and value of the deposit and officers of the company are highly pleased with the showing |