Show around the state on the 2nd and the directors of the grand central mining company operating in the tintic gintic district declared a of 3 cents a share aggregating it is payable today E K bradley and john rowe are doing some electrical work at the site of the tin tic standards new mill near warm creek sl some ome very substantial buildings have been erected there for use as boarding and lodging houses for the men and for office purposes the excavating for the big mill is now under way two shifts are sending the central standard companas Comp anys tintic gintic shaft down at greater speed than has been possible at any time since the work was started on this property the shaft is now nearing the lever and the water is being taken care of in in such manner that it does not seriously interfere with sinking operations work has been resumed in the boston consolidated mine which comprises the upper levels of the utah copper property at bingham this portion of the pro petry has been idle for several months four shovels will be operated for the present there is still a shortage of skilled labor at all the mines in the district and several hundred men could obtain employment hauling of ore from the cardiff bins situated at the junction of the south fork and the big cottonwood canyon started on the 1st ast stored in those bins there are about tons of ore which will be hauled to the railroad loading station at lovendahl so south uth of salt lake city in addition to the two trucks which are hauling ore to the station the company ts is working a force of ten men in developing the mine the road up the south fork to the mine would not be in such bad shape with regard to snow if it were not for two bad slides on greenes hill reopening of the road for ore hauling will depend altogether on the rate at which the snow melts |