Show consolidated SPANISH BELT tonopah To nevada jan 13 progress at the property of the spanish belt consolidated for the past week was as follows san pedro the face of the east drift on the first level is now feet from shaft the formation is harder otherwise there is no change from last week ore is still being sacked at the two raises and continues to be of good grade the haulage of this shipping ore is being rushed while good weather continues and it is being stored on a platform in below the main workings there is a good deal of milling ore which is being stored in cross cuts on the first level east barcelona no change here from last week but timbering has been completed and drilling now resumed the vein stands vertical and there is considerable talc on each wall the ground needs close timbering west barcelona timbering was completed and drilling resumed on an january the total distance is now seventy four feet from main crosscut cross cut there is low grade ore in the face ernst level this was advanced seventy two feet making the total distance from main raise feet two short eaves caves were encountered where was necessary and between the eaves caves there was over two feet of mud and other debris the face is now at another cave which appears to be extensive quartz showing bunches and streaks of high grade continues to be found along sides of drift |